Vendors
Bid Requests
Occasionally, Colby Community College requests bids for large projects and purchases. Unless otherwise noted in the individual requests, all bids must be submitted to:
President Dr. Seth Carter
Colby Community College
1255 South Range Ave
Colby, KS 67701
Active RFPs
There are no projects at this time.
Past RFPs
Air Conditiong RTUs -- Cultural Arts Center
Air Conditioning RTU -- Student Union
Veterinary Stationary Digital Radiology Machine
Computer Lab Refresh, Phase II
Concrete in Pens at the CCC Farm
Replacement Roof - Student Union
Dental Hygiene Intraoral Sensor Starter Kit
Dental Hygiene Ultrasonic Scaler
Uninterruptible Power Supplies (UPS)
Bathroom Replacement - phase I
15-Passenger Van or Bus REVISED
Integrated Institutional Software
Electronic Access Control System
Furniture Replacement (Rev. June 18)
Replacement of Two Vehicles (postponed)
Boiler for Bedker Memorial Complex
Furniture Replacement (postponed)
2020
Flooring -- Bedker Memorial Complex and Cultural Arts Center
Roof for the Ceramics Building
Network Switches and Cabling Phase 2
Fiber Installation Cabling Phase II
Network Switches and Cabling, Phase I
Flooring for Bedker Memorial Complex
Cultural Arts Center Roof Replacement
2019
Flooring for Administrative Complex - Thomas Hall
Netting for indoor baseball/softball hitting cages
Network Cabling and Fiber Optic Educational Kits
Replacement of Library Planter Boxes
Furniture for Living Center East -- south section
Fiber Optic for Five Buildings
Fiber Optic Infrastructure, Big Blue Barn
15-Passenger Van/Bus (reissued)
Renovation of Living Center East, south section
2018
Athletics Practice/Intramural Facility (Big Blue Barn)
Storage Area Network, Switches and Disaster Recovery
2017
Renovation of Living Center East -- east section
Replacement of roofs at the CCC farm
New 4WD utility terrain vehicle
One pre-owned 15-passenger van
New furniture for Living Center East
Roof replacement for Living Center East-East and lobby
Renovation of Living Center East -- north section
2016